O’Hare International Airport
Awarded the High Temp Water Generator at O’Hare International Airport, Helm’s scope for this multi-year project consists performance of the General Work, Mechanical Structural Work, Architectural Work, and Electrical Work, including all appurtenant work and accessories. This includes, but not limited to, Phased demolition of eight (8) existing High Temp Water Generators, eight (8) HTW Generator Pumps, three (3) North HTW System Pumps and the new construction associated with the installation of new HTW Generators, HTW Generator Pumps, and North HTW System Pumps, including associated HTW, Natural Gas, Compressed Air, Atomizing Steam and Fuel Oil piping, Insulation, Power Distribution to new equipment, HTW Generator Control and associated electrical work, and Structural Support work.