Projects

Lock and Dam 15 Mississippi River Guidewall Replacement

Work on this Lock and Dam was done off of Arsenal Island and barges.  Helm replaced 400 feet of guidewall over 3 winter seasons.  For each repair, a cofferdam was built on the river side.  Next, the cofferdam was dewatered and the 80-year old guidewall was removed.  A new guidewall was formed and poured over new drilled caissons.

Together, We Build the Future

Whether you’re interested in our services, have a question, or want to discuss a project, we’re here to help. Reach out to us today, and let’s start the conversation.